Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13696757
- Product Categories
- Friendly Links
Information Name: | Supply Cailv gutter, finished Gutter, water system |
Published: | 2015-07-10 |
Validity: | 30 |
Specifications: | 6 inches 7 inches 8 inches |
Quantity: | 100000000.00 |
Price Description: | |
Detailed Product Description: | Supply Cailv gutter, finished Gutter, water system: First, the rain gutter (gutter) Installation: 1, in the rain gutter installation level position to play from the beginning end to the bomb did not end with the ink line. 2. Remove from the bag rain gutters, the steady rain gutter on the ground or on the scaffold, and at gutter level loading water bucket position, with a cutter cut a water bucket with a drain hole in the same size. 3, the water bucket was slowly inserted into the gutter to the launch position. 4, mounted on a rain gutter hanging connector; in order to insert and master pitch, the distance between two adjacent hanging connector is 40 ~ 45CM; 5, with an electric drill (6 bits) in shells line position at 40 ~ 45CM hole spacing fight and knocked into the expansion pipe. 6, gutters to place in the play line position, adjust the "hanging connector" pitch, then ∮4X40 stainless steel screws to hang connector and rain gutters fixed. 7, encounter rain gutters corner, needed "card connector" connection "positive angle", "negative angle", rain gutters and rain gutters connecting portion is also used as "card connector" connection. 8, rain gutter installation process in order to prevent the leakage, lock complete, the card connector, and other relevant parts required for glass, plastic and marked with PVC glue. Second, the rain water pipe (the pipe) Installation: 1. Remove the bag from the rain square tube, placed on the floor or scaffolding. 2, in the rain water tank position on the line hammer hanging, so that is perpendicular to the ground, and choose a good anchor points in this vertical position, keep a good distance (ie, locator and the locator spacing between 110CM ~ 130CM). 3, with drill holes lay at anchor, and knocked into the expansion pipe. 4, in the water bucket position with the "drain" on the inside of the lead under the rain pipe, wall-vertical lead with a fixed retainer and master pitch; drainage around the sides with ∮3X10 stainless steel screws. 5, the drainage, interface connector at the square tube glass with PVC glue or adhesive bonding. |
Admin>>>
You are the 22754 visitor
Copyright © GuangDong ICP No. 10089450, Building Materials Co., Ltd. Hangzhou Ruichen All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 22754 visitor
Copyright © GuangDong ICP No. 10089450, Building Materials Co., Ltd. Hangzhou Ruichen All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility